Walls, Ceiling and Floor Leveling, and Preparing.
To create a smooth and high-quality base for finishing work, a set of preparatory measures must be carried out.
- Plastering and filling walls, and ceilings to eliminate uneven surfaces, cracks, and other defects.
- Priming all surfaces to enhance adhesion of finishing materials.
- Floor leveling: pouring self-leveling compounds, installing a cement screed, or laying plywood if necessary.
- Additional reinforcement of cracks and weak areas using fibreglass mesh.
- Waterproofing wet areas (bathroom, kitchen) to prevent moisture penetration.
- Anti-Mould finishes